Projects
AFTAB IMEN PARTO Consulting Engineering Company (AIPCECO) is one of the most famous and a pioneer company in offering consultancy services in the field of safety engineering and HSE management and has always put his effort to apply the innovative and the newest methods and updated information to perform the projects. Execution of more than 190 projects of HAZOP and HAZID, 45 SIL projects, 50 consequence modeling and Risk Assessment projects and several HSE management project in more than 350 process and non-process units has made AIPCECO a distinct company regarding its unique capabilities, talents and experiences. Execution of several Hazard identification projects which come as follows indicates the capabilities of the company.
Iran refineries Such as Tehran, BandarAbbas, Tabriz, Isfahan, Lavan, Shiraz, Arak & Qeshm, Bid Boland, Sahand Khalij-e Fars, Parsian, Kangan
Projects of arak petrochemicals, Khorasan, Razi, Shiraz, Tabriz, Mobin, Tondgooyan, Mamasani, Fajr2, Kermanshah, Fasa, Pardis, Buali Sina, Lordegan, Dehdasht, Zanjan, Broujen, Damavand, Mehr Petrokimia, FirouzAbad, Khouzestan, Morvarid, Karoon, Basparan-Bandar Imam, Bandar Imam, Faravaresh-Bandar Imam, Hormoz, Lavan, Kimia-Bandar Imam, Mokran, Marjan, Zagros, Nouri(Borzouyeh)
The contractor of safety engineering of phases 15 & 16 ( Offshore section) , Khesht oil field, consultant and supervisor in the field of safety engineering and HSE in EPC projects of Pasargad oil company
Performing more than 50 consequence modeling projects
Project Records (incl. managers and staff experience)
No. | Project Name | Client | Date |
390 | HAZOP and SIL Studies for Sulfur Recovery Plant of Tabriz Oil Refining Company | Oil Design and Construction Company (ODCC) | 2021 |
389 | HAZOP and HAZID Studies of “Gas Condensate Feed Storage Tank” Project of Bandar Abbas Refinery | Fara Petrosazan Energy Company | 2021 |
388 | HAZOP and HAZID Studies of "26 inch Bandar Abbas-Mehraran Oil Products Transmission Pipeline" Project | Tadbir Energy Gostar Iranian Company | 2021 |
387 | HAZOP and HAZID Studies of “Common Facilities of ASU I” for Damavand Petrochemical Company | Damavand Petrochemical Company | 2020 |
386 | HAZOP Study of “Desulfurization Methane Purification Unit (MPU Package)” for MEG Plant of Bushehr Petrochemical Company | Sina Engineering Design & Manufacturing Company | 2020 |
385 | HAZOP Study for Branched lines of Ethane and Propane from Bid Boland Refinery to Amir Kabir Petrochemical Company | Amir Kabir Petrochemical Company | 2020 |
384 | HAZOP Study for Loading of N2 Line and O2 by Truck of Bushehr Petrochemical Complex | Bushehr Petrochemical Complex | 2020 |
383 | HAZOP Study for Metering Package and Analyzer House of West Karoun Area NGL3200 Project. | Metering Technology Automation Solutions (MeTAS) | 2020 |
382 | HAZOP, HAZID, SIL Studies of Yeild Improvement of MEK De-Waxing Unit for Iranol Compnay. | Faranegar Industrial Design & Engineering Company | 2020 |
381 | HAZOP Study for Basic Design of New CDU (Prefractionator) of MTA Holding Oil Products Manufacturer | MTA Holding Oil Products Manufacturer | 2020 |
380 | HAZOP Study for Storage Terminal development Plan of farasakou Assaluyeh Company | Hampa Energy Engineering & Design Company (HEDCO) | 2020 |
379 | Review of Hazardous Area Classification for Bu Ali Sina Petrochemical Company | Bu Ali Sina Petrochemical Company | 2020 |
378 | HAZOP study of Hydrogen Purification Package of olefin unit of Kangan Petrochemical Development Company | Sina Control, Engineering design and manufacturing company | 2020 |
377 | Consequence Modeling and Quantitative Risk Assessment for Olefin Plant of Kian Petrochemical Complex | Energy Industries Engineering and Design Company (EIED) | 2020 |
376 | HAZOP Study for Olefin Unit of Marun Petrochemical Complex | Marun Petrochemical Complex | 2020 |
375 | HAZOP and HAZID Studies for Zabol CGS station and Dashtak-Zabol 24” Gas Pipline | Tarh Andishan Consulting Engineers Company | 2020 |
374 | HAZOP Study for Crude Oil Storage Tanks, Booster Pumps and Utility of Sabzab Pump Station | Danial Petro Company | 2020 |
373 | HAZOP, HAZID, SIL Studies of “Central Treatment and Export Plant (CTEP) of South Azadegan Oil Field Development (Phase I)” Project | Enerchimi Engineering Company | 2020 |
372 | HAZOP and HAZID Studies of “30 inch Bandarabbas/ Laft/ Gavarzin/Gas Transmission Pipeline & 16 inch Persian Gulf Industrial Zone Gas Pressure Control Station” project | Tadbir Energy Gostar Iranian Company | 2020 |
371 | Value Engineering for Development projects of Maroon Petrochemical Complex | Tarhandishan Consulting Engineers Company | 2020 |
370 | HAZOP Study of Khatoon Abad Copper Smelter Expansion Project | Canymes Company | 2020 |
369 | HAZOP Study for SHZAND Petrochemical Complex Refrigeration Package | Sina Control Engineering design and Manufacturing Company | 2020 |
368 | HAZOP Study for Flare Package of Arian Petrochemical Complex | Masnouat Felezi Sangin Company | 2020 |
367 | HAZOP and SIL Studies of Utility and Offsite for Bushehr Petrochemical Complex | Petrogas Jahan Engineering Company | 2020 |
366 | Fire and Safety Audit Studies at Ghadeer petrochemical Complex | Ghadeer Petrochemical Company | 2020 |
365 | HAZOP, HAZID and SIL Review of Utility and Offsite Units of Damavand Petrochemical Complex | Damavand Petrochemical Company | 2020 |
364 | HAZOP and SIL Studies of HDPE Unit for Soroush Mahestan Asaloyeh Complex | Soroush Mahestan Asaloyeh Company | 2020 |
363 | HAZOP Study of Oxygen line of Methanol Unit of Bushehr Petrochemical Complex | Bushehr Petrochemical Company | 2020 |
362 | HAZOP and SIL Studies for Cooling Blowdown Recovery System of Masjed Soleyman Petrochemical Industries Complex | FALAT Energy & Utility Company | 2020 |
361 | HAZOP, HAZID, SIL Assessment and Consequence Modeling Studies of Isomerization (ISOM) unit of Shiraz Refinery Company | Jondishapour Company | 2020 |
360 | HAZOP, SIL Identification and SIL Verification Studies for Turbo Compressor Package of Palayesh Parsian Sepehr Complex | Persia Petro Gas Company | 2020 |
359 | Modeling & Updating of Fire water/foam network and firefighting and cooling systems at AR and OL units of BIPC | Bandar Imam Petrochemical complex (BIPC) | 2020 |
358 | HAZOP, HAZID and SIL studies for Wellhead, Manifold, Pipeline and Production Operation of Sepehr-Jufair Project | Chagalesh Consulting Engineers | 2020 |
357 | Providing Consulting Services In Transportation Safety of Pressurized Ethan Cylinders in Amirkabir Petrochemical Company | Amirkabir Petrochemical Company | 2020 |
356 | Consequence Modeling and HAZID Study with Fire approach for MOTS (Mobile Oil Treatment) in Sepehr-Jofeir Oil Field | Chagalesh Consulting Engineers | 2020 |
355 | Engineering Studies of Fireproofing for Fravaresh Petrochemical Complex | Fravaresh Petrochemical Complex | 2020 |
354 | HAZOP and HAZID studies of “Iranshahr-Cheb 56 Inch Gas Pipeline (Section 2)” | Tadbir Energy Gostar Iranian Company | 2020 |
353 | HAZOP, HAZID, SIL, QRA, CM Studies of “Tankage Area Facilities of Qeshm Oil Terminal in Loading and Unloading Mode” Project | Shargan Consultant Engineers Company | 2020 |
352 | HAZOP Study of ASU and C/A (Chlor-Alkali) Units of Arvand Petrochemical Company | Arvand Petrochemical Company | 2020 |
351 | HAZOP and HAZID Studies of “42 inch Mokran, 20 inch Chabahar and 16 inch Konark for Sistan and Balouchestan Gas Pipeline Project” | Sisakht Consulting Engineers | 2020 |
350 | HAZOP and SIL Assessment Studies of “Olefin Unit” and HAZID, QRA and Consequence Modeling Studies of “Dehloran Petrochemical Complex” | Energy Industries Engineering and Design Company (EIED) | 2020 |
349 | Fire and Safety Audit studies at Iranol Oil Company | Iranol Oil Company | 2020 |
348 | HAZOP and HAZID Studies of " Iranshahr to Chabahar 56 Inch Gas Pipeline" Project | Soroush Energy Pooya Company | 2020 |
347 | HAZOP & HAZID Studies for “Export of West Karoon Crude Oil from Kharg” Project | Sazeh Pardazi Iran Consulting Engineers Company (SPI) | 2020 |
346 | HAZOP study of Connecting 4 inch line from Amirkabir West Ethylene Independent Line for feeding Ghadir Petrochemical by Hot Tap | Amir Kabir Petrochemical Company | 2020 |
345 | HAZOP Study for “Gurreh-Jask Crude Oil Pump Station No.5” | Rahbord Energy Design & Development Engineering Company | 2020 |
344 | HAZOP, HAZID, SIL, Consequence Modeling and Quantitative Risk Assessment studies for Acrylonitrile (AcN) Storage and Transfer Facilities of JAM ABS & Rubbers Plant | Jondishapour Company | 2020 |
343 | Integrated HAZOP & HAZID Study for ISO TANK of the Amir Kabir Petrochemical Company | Amir Kabir Petrochemical Company | 2019 |
342 | SIL Verification of Fire and Gas System for DHT Plant of the Esfahan Oil Refinery | Pars Hassas Company | 2019 |
341 | HAZOP, HAZID Study for Khash to Mirjaveh 10” Gas Transfer Pipeline and CGS of Mrjaveh | Tehran Ramian Company | 2019 |
340 | HAZOP and SIL Study for Gurreh-Jask Crude Oil Pump station No.4 | Jondishapour Company | 2019 |
339 | Establishment of HSE management system in Shahrvand stores | Shahrvand Company | 2019 |
338 | HAZOP and SIL and Layer of Protection assessment of SCADA system for Tehran GAS Station | Samavat Specialized Group | 2019 |
337 | HAZOP/HAZID/SIL studies of Trap Terminal and Pigging Station No. 1 and 2 –Basic Design of Gurreh-Jask Pipeline and Facilities | Middle East Energy Development Company | 2019 |
336 | HAZOP, HAZID, SIL, QRA, Consequence Modeling of “Supplying feed from Flared Gas Streams to Persian Gulf Bid Boland Refinery, Basic Design & FEED Preparation” project | Tehran Raymand Consulting Engineers Company | 2019 |
335 | HAZOP & SIL Studies of Second Pump Station of Goreh-Jask Oil Transferring Project | Sanat va Modiriat Iran Consulting Engineers | 2019 |
334 | HAZOP, HAZID, SIL Studies of 16” Rey-Sari Pipeline and Relevant Facilities Project | Tarh-O-Palayesh Engineering Company | 2019 |
333 | Zanjan Urea Fertilizer Project-Ammonia Plant & Flare section | Petrochemical Industries design and engineering company | 2019 |
332 | Fire and safety audit studies in process units and tank farm | Rubber Industries Investment and Development Company | 2019 |
331 | Consequence Modeling and Quantitative Risk Assessment (QRA) Study of ARADAN Gas Compressor Station | Pars Consulting Engineers Group | 2019 |
330 | HAZOP study of C3/C4 Mixture Transmission Pipelines from Mahshahr Facilities to Bandar Imam Petrochemical Complex |
Consortium of Sazeh & Jahanpars |
2019 |
329 | Consequence Modeling for elimination Acetylene Flaring From Butadiene Unit in Jam Petrochemical Complex | Jam Petrochemical Complex | 2019 |
328 | HAZOP Study of Sarvestan & sa'adat Abad and Farashband Oil & Gas Fields | Zagros Oil & Gas Production Company | 2019 |
327 | HAZOP & HAZID Studies of Storage tanks of Oil terminal and integratet transmission Pipeline (from GAVAR Zine to Qshm Deyrestan) and Phase one of tank Farm of Qshm Oil Investment Company | Qshm Oil Investment Company | 2019 |
326 | Action Plan Development for Pardis Petrochemical Company | Pardis Petrochemical Company | 2019 |
325 | Fire Zone Spacing and Fireproofing Study for Tondgoyan Petrochemical Complex | Tondgoyan Petrochemical Complex | 2019 |
324 | Modification (Mini) HAZOP Study on New Bypass Facilities for Check Valve on Export Methanol Product line of Kimiya Pars Khavarmiyaneh Petrochemical company | Middle East Kimiaye Pars Company | 2019 |
323 | HAZOP Study of Propane BOG Compressor Package of Parsian Sepehr Gas Refinery | HAMPA Energy Engineering and Design Company (HEDCO) | 2019 |
322 | HAZOP & SIL study of Persian Gulf Bid Boland gas treating project part B- Acid Gas & Sales Gas Pipeline and Facilities | Tehran Jonoob Technical & Construction Company | 2019 |
321 | HAZOP and SIL Study of New Dehexanizer of APG GUM Removal Project of Tabriz petrochemical Plant | Namvaran Pazhouhesh va Tose-a Company | 2019 |
320 | HAZOP Review, SIL Assessment, SIL Verification for HDPE, OLEFIN, Utility and offsite of Ilam Petrochemical Company | Ilam Petrochemical Company | 2019 |
319 | HAZID study of Ethane Pipeline from Persian Gulf Bid Boland Gas Treating Plant to Gachsaran Petrochemical Plant | Persian Gulf Bid Boland Gas Treating Plant | 2019 |
318 | HAZOP Study of Parsi Separation and Compressor/ Pump Station (ABSILAB Station - Crude Oil Production Unit) | Binak Mechanic Company | 2019 |
317 | HAZID Study of Utilities and Offsite of Mokran Petrochemical Complex-Stage 1 | Namvaran Pazhouhesh va Tose-a Company | 2019 |
316 | Integrated HAZID and HAZOP Study of Chlorine Unloading Facilities (from 1 ton cylinders to 90 ton storage tank) | Karun Petrochemical Company | 2019 |
315 | HAZOP & HAZID Studies for 30 & 20 Inches Gas Transmission Pipeline from Bidboland to Gachsaran | Petro Sadian-Tehran Berkeley Company | 2019 |
314 | HAZID and HAZOP Study of JASK Crude Oil Storage Tanks and facilities | Petro Omid Asia Company | 2019 |
313 | HAZID and HAZOP Study of JASK Terminal, SPM & Marine Facilities | Consortium of Soroush Energy Poya and Tarh-e-Nowandishan Company | 2019 |
312 | HAZID and HAZOP Study of 32” Sour Gas Feed Pipeline between Phase 14B and Phase 12 of South Pars Gas Refinery | Borna Tadbir Behta Company | 2019 |
311 | HAZOP Study of Flare Recovery and Desulfurization Facilities of Bank G of Maroun 3 Plant | Hirbod Niroo Company | 2019 |
310 | HAZOP Study of Ethane Pipeline and Metering facilities from Bid Boland II (Part B) to NF unit of Bandar Imam Petrochemical in Mahshahr Especial Zone | Maroun Mechanic Company | 2019 |
309 | Improve the safety situation at the raw materials and product warehouses of Arvand Petrochemical Company | Arvand Petrochemical Company | 2019 |
308 | Job Hazard Analysis and Risk Assessment by JHA Method for whole Job in Laleh Petrochemical Company | Laleh Petrochemical Company | 2019 |
307 | HAZOP Study Report for Nitrogen Package of Palayesh Parsian Sepehr | Havayar Industrial Group | 2019 |
306 | HAZOP, HAZID, SIL, QRA, RAM and ENVID Studies for Aban Oil Field Development and Paydar West Project | Tehran Raymand Consulting Engineers Company | 2019 |
305 | HAZOP Study for 32" Sour Gas Pipeline from IGAT 5 to the Unit 170 of Phase 14 of South Pars | Neyr Perse Company | 2019 |
304 | HAZOP, HAZID & Consequence analysis for Ethane, Propane, Butane & C5+ export lines between client plant and Mobin Corridor and relevant Valve Station | Palayesh Parsian Sepehr Company | 2019 |
303 | Design of Fire Alarm System at the product warehouse and packing Section of Laleh Petrochemical Complex | Laleh Petrochemical Company | 2018 |
302 | HAZOP Study on 1,3-Butadien/ Acrylonitrile Transfer Pipelines between JPC/Pars Port to PadJam Petrochemical Plant | Petro electric Energy Development Company | 2018 |
301 | HAZOP study of Steam Methane Reformer Unit of Ardebil Methanol Plant | Arta Energy Company | 2018 |
300 | HAZOP study of Cargo Storage Tanks and Transferring Facilities of Exir Chemical Terminal | Exir Chemical Terminal Company | 2018 |
299 | HAZOP study of Compressed Air and Nitrogen Generation Packages of Persian Gulf Bid Boland II Gas Treating Company | Havayar Industrial Group | 2018 |
298 | Hazard Identification Studies by FMEA Method for SIGMA 1-14 Centrifuge | Armin Shegarf Company | 2018 |
297 | SIL Verification Study in CPF Section of Azar Oil Production Unit | Jahanpars Company | 2018 |
296 | Job Hazard Analysis and Risk Assessment by JHA Method for whole Job in Mahabad Petrochemical Company | Mahabad Petrochemical Company | 2018 |
295 | Job Safety Analysis for whole Job in Morvarid Petrochemical Company | Morvarid Petrochemical Company | 2018 |
294 | HAZID and HAZOP Study of Fuel Gas Letdown Station (GPRS) of Besat Power Plant (Central Power Plant of South Pars Gas Field Development) | Monenco Iran Consulting Engineers | 2018 |
293 | HAZOP Study for MPU of Shazand Petrochemical Company | Sina Control Company | 2018 |
292 | HAZOP and HAZID Study of Seawater Intake Unit and Chlorination Package for Phase14 of South Pars Gas Development | Sahel Omid Iranian Consultant Engineers Company | 2018 |
291 | HAZOP Study of H2 PSA Purification for Tabriz Oil Refinery | Havayar Industrial Group | 2018 |
290 | Mini HAZOP Study for Installation of New Carbon Steel Filter on inlet of Sweet Gas to Recovery Ethane Unit | Bushehr Petrochemical Complex | 2018 |
289 | HAZOP Study of MEG Plant Flare Package of Bushehr Petrochemical Company | Tehran Javan Company | 2018 |
288 | HAZOP and HAZID Study of Bandar Abbas Sulphuric Acid Transport of Copper Terminal Project (EPC&O) Related to Sarcheshmeh Copper Investment Company | Scetiran Consulting Engineers Company | 2018 |
287 | HAZOP, HAZID & QRA study of basic design and supervision services for Khormooj and Abpakhsh BGCS-IGATVI | Scetiran Consulting Engineers Company | 2018 |
286 | Determining minimum safety distance between the new acid storage tank and adjacent equipment | Sarcheshmeh Copper Complex | 2018 |
285 | HAZOP Study of Central Waste Water Unit of Bandar Imam Petrochemical | Mojan Engineering Company | 2018 |
284 | HAZOP and HAZID Studies for Ethane and Ethylene Storage Tanks and Pyrolysis Gasoline Loading/ Raffinate Unloading Facilities for Amir Kabir Petrochemical Complex | AmirKabir Petrochemical Complex | 2018 |
283 | SIL Verification of CO2 Compressor Package of Bushehr MEG Plant | Persian Petro Gas (PPG) Company | 2018 |
282 | Fire Water Demand Calculation of Marun Pouya Polymer Company (MPPC) | Marun Pouya Polymer Company (MPPC) | 2018 |
281 | HAZOP & HAZID Six Renew existing Gavarzin Gas Field Flowlines replacement, GZ09 Wellhead, Reception and Separation Facilities EPC Project | SAIED Sanat Maroon Company | 2018 |
280 | Quantitative Risk Assessment (QRA) of Azar Oil Product Pipeline | Iran Arvin Engineering & Construction Co. (IAC) | 2018 |
279 | HAZOP and SIL Studies for Lavan Integrated Methanol and Ammonia Plan | Lavan Industry Development Company | 2018 |
278 | HAZOP Study for Bitumen Units of Bandar Abbas and Esfahan Oil Refinery | Jey Oil Refining Company | 2018 |
277 | HAZOP study of Feed Gas Metering Package of Sodium Carbonate Kaveh Plant | Kaveh Sodium Carbonate Company | 2018 |
276 | Fireproofing Study for Structure of Aria Sasol Polymer Company | Aria Sasol Polymer Company | 2018 |
275 | HAZOP & SIL Study of Ethane Feed Pipeline between Persian Gulf Bid Boland Gas Treating Plant and Gachsaran Petrochemical Plant | Persian Gulf Bid Boland Gas Treating Plant | 2018 |
274 | HAZOP & HAZID Study for C2+ Pipeline from Mohr Site to Assaluyeh Site-Parsian Sepehr C2+ and Fractionation Project | Sisakht Consulting Engineers Company | 2018 |
273 | Maintaining and developing of HSE management system based on HSE management system requirements of Tehran municipality | Abbas Abad Land Rehabilitation organization | 2018 |
272 | HAZID Study of Sulfur Export Jetty of Mahshahr Terminal | Hendeseh Pars Company | 2018 |
271 | HAZOP & Safety Study for Effluent Treatment Plant-VOC Gases Treatment of Marun Petrochemical | Payesh Zist Azma Group (EMACO) | 2018 |
270 | Quantitative Risk Assessment in Pardis Petrochemical Complex | Pardis Petrochemical Complex | 2018 |
269 | HAZOP & SIL Study of Part B of Mahshahr Facilities and Pipelines of Persian Gulf Bid Boland Gas Treating Project | Tehran Jonoob Technical & Construction Company | 2018 |
268 | Risk assessment of the feed pump boiler building in Road Shoor Power Plant by using QRA method | Mapna Company | 2018 |
267 | HAZID Study of Mahshahr Terminal Sulphur Export Jetty | Omran Sahel Company | 2018 |
266 | HAZOP & SIL study of Persian Gulf Bid Boland Gas Treating Project Unit 460 - 120 T/H New Package Boiler | Tarahan va mojrian Farayand Bokhar | 2018 |
265 | Consequence Modelling Analysis for B1, BD and LDPE units of Amir Kabir Petrochemical Company | Amir Kabir Petrochemical Complex | 2018 |
264 | Modelling and updating of water and fire foam network, fire extinguishing and cooling systems in tanks and equipment of Aromatic Plant | Bandar Imam Petrochemical Complex (BIPC) | 2017 |
263 | HAZOP and SIL Study of Steam Generation Unit of Persian Gulf Bid Boland Gas Treating Plant | Azarab Industries Company | 2017 |
262 | HAZOP and SIL Study of CO2 Compressor Package of MEG Unit of Bushehr Petrochemical Company | Persian Petro Gas (PPG) Company | 2017 |
261 | HAZOP Studies for Ethylene Oxide, Ethanol Amine, Glycol Ether and Ethoxylation Units of Hamedan Ibn Sina Petrochemical | Hamedan Ibn Sina Petrochemical Company | 2017 |
260 | HAZOP study of BD Production Unit of Basparan Bandar Imam Petrochemical Complex | Bandar Imam Petrochemical Complex (BIPC) | 2017 |
259 | HAZOP and HAZID for Completion of 56 Inch Gas Pipeline from Aftab Gas Refinery to IGAT-7 | Maroon Karan Company | 2017 |
258 | Prepare of Master Document Register (MDR) list in industrial projects | Bandar Imam Petrochemical Complex (BIPC) | 2017 |
257 | Design of portable fire extinguishers at the MTBE unit and Utility unit of Bandar Imam Petrochemical Complex | Bandar Imam Petrochemical Complex (BIPC) | 2017 |
256 | HAZOP, HAZID, QRA and SIL Study for Process and Utility Plant | Governmental Client | 2017 |
255 | Carrying out an inspection for implementation Fireproofing in Kimia and Basparan Bandar Imam Petrochemical Complex | Bandar Imam Petrochemical Company (BIPC) | 2017 |
254 | HAZOP Study of LP Compressor Station for Gathering of 2nd Stage Excess Gas in Gachsaran I & II Production Units | Maroon Karan Technical and Engineering Company | 2017 |
253 | HAZOP Study for Esfahan Oil Refinery- Five Utility Packages Project | Neyr Pers Company | 2017 |
252 | Fire and Explosion Quantitative Risk Assessment Study in Pasargad Oil Company | Pasargad Oil Company | 2017 |
251 | HAZOP Study for Ethylene Let down Station of Arvand Petrochemical Company | Arvand Petrochemical Company | 2017 |
250 | Blast Analysis of Control Room and Substation Building in Central Waste Water Treatment of Bandar Imam Petrochemical Complex | Bandar Imam Petrochemical Complex (BIPC) | 2017 |
249 | HAZOP & SIL Studies for Abadan Refinery Upgrading Project-Phase 1 (CDU, VDU and LPG Recovery Unit) | Oil Design and Construction Company (ODCC) | 2017 |
248 | Job Hazard Analysis and Risk Assessment by JHA Method in JAM Petrochemical Complex | Jam Petrochemical Company | 2017 |
247 | Job Hazard Analysis and Risk Assessment by JHA Method in Tehran Parks & Green Space Organization | Municipality of Tehran- Tehran Parks & Green Space Organization | 2017 |
246 | Engineering Studies of Fireproofing for Amir Kabir Petrochemical Company | Amir Kabir Petrochemical Company | 2017 |
245 | HAZOP Study for Siraf Condensate Refinery Project-Jetty System | Energy Industries Engineering & Design (EIED) | 2017 |
244 | HAZOP, HAZID, SIL, QRA Study for west Karun power plant & facilities gas & water supply project | Jahanpars Company | 2017 |
243 | SIL Study,SIL Verification,Improvement of Client Instrument and SRS Development for Parsian C2 Recovery and C2+ Fractionation Project | Hampa Energy Engineering and Design Company (HEDCO) | 2017 |
242 | Safety Study for LPG Road Tanker unloading in Amir Kabir Petrochemical Company | Amir Kabir Petrochemical Company | 2017 |
241 | HAZOP Study for Parsian C2 Recovery and C2+ Fractionation Project | Hampa Energy Engineering and Design Company (HEDCO) | 2017 |
240 | HAZOP and SIL studies of Desalter Package for Central Processing Facilities of AZAR Oil Field Development Project | Gastech Company | 2017 |
239 | HSE Gap Analysis at the raw materials warehouses and PVC unit warehouse | Bandar Imam Petrochemical Complex | 2017 |
238 | Design & implement of training software according to Process Safety Management (PSM) trainin | Bandar Imam Petrochemical Complex | 2017 |
237 | Dikes Wall Standardization of Basparan Complex by Using Credible References | Bandar Imam Petrochemical Complex | 2017 |
236 | HAZOP, HAZID& SIL Study for NaftSefid Oil Field Gas and Oil System Optimization and Renovation Project (Detailed Eng.phase) | Tarhandishan Consulting Engineers Company | 2017 |
235 | HAZOP/ Safety Study for Effluent Treatment Plant-VOC Gases Treatment | Payesh ZistAzma Group (EMACO) | 2017 |
234 | HAZOP Study for New 20”Natural Gas Pipeline Facilities | Bandar Imam Khomeini Petrochemical Company (BIPC) | 2017 |
233 | HAZOP Study of Sour Gas Interconnecting Pipeline between South Pars Refineries | Sazeh Consulting Engineers Company | 2017 |
232 | HAZOP and SIL Study of Reverse Osmosis Package | AVE Company | 2017 |
231 | Quantitative Risk Assessment for fuel gas station | Bandar Imam Petrochemical Complex | 2017 |
230 | SIL Study for Utility and Off-site Units of Esfahan Oil Refinery | Neyr Perse (Mapna Group) | 2016 |
229 | Providing Consulting Services and training in order to improving and maintaining HSE management system | Municipality of Tehran Tehran Parks & Green Space Organization | 2016 |
228 | HAZOP Study for Product Loading Arms of Esfahan Oil Refinery | Petro Tech Sun (PTS) | 2016 |
227 | Hazard Study, Feasibility study of Electricity Post displacement, and Flare Layout in OL2 unit | Bandar Imam Petrochemical Complex | 2016 |
226 | Reviewing the existing conditions and presenting improvement solutions in HSE field in the workshops and warehouses of Sharif university of technology | Sharif University of Technology | 2016 |
225 | HAZOP and SIL Study for Interconnecting Pipelines Between South Pars Refineries for Site 1&2 | Sazeh Consulting Engineers Company | 2016 |
224 | HAZID Study in Construction and Commissioning Phase & HAZOP Study of Package of Azar Oil Field Development Project | Jahanpars Company | 2016 |
223 | Quantitative Risk Assessment for LPG Loading for Tombak Service and Export Port | Omran Sahel Company | 2016 |
222 | HAZOP and HAZID Study of South Pars Gas Refineries I & II Common Corridor | Borna Tadbir | 2016 |
221 | HAZOP Study for West Karun Oil Transmission Capacity Increase | Tarh O Palayesh Engineering Company | 2016 |
220 | HAZOP Study for CO2 Compressor of LORDEGAN Petrochemical Company | Havayar Industrial Group | 2016 |
219 | HAZOP Study for Marun Petrochemical Low Density Polyethylene (LDPE) | Laleh Petrochemical Complex | 2016 |
218 | HAZOP Study for Parsian C2+ Recovery & Fraction | Hampa Energy Engineering & Design Company (HEDCO) | 2016 |
217 | HAZOP Study of Hydrogen Transfer Pipeline of Karoun Petrochemical Company | Karoun Petrochemical Company | 2016 |
216 | HAZOP Study of South Pars Central Combined Cycle Power Plant | Farab Company | 2016 |
215 | HAZOP, HAZID, SIL & QRA Studies for South Yaran Oil Field Development Wellhead Facilities and Flow Lines | Soroush Energy Pooya (SEP) | 2016 |
214 | HAZOP Study for Dalan Pig Launcher/ Receiver Facilities | South Zagros Oil and Gas Production Company (SZOGPC) | 2016 |
213 | HAZOP and SIL Study for Esfahan Oil Refinery DHT Unit | Nargan Company | 2016 |
212 | Safety Study for Construction of Refrigeration unit of Bidboland refinery in BIPC | Bandar Imam Petrochemical Complex | 2016 |
211 | HAZOP Study of PVC Unit of Bandar Imam Petrochemical Company | Bandar Imam Basparan Complex | 2016 |
210 | HAZID & QRA Studies of Pipeline routed from BIPC to out of the complex | Bandar Imam Petrochemical Complex | 2016 |
209 | Hazardous Area Classification study of Olefin Unit of Faravaresh Petrochemical Complex | Bandar Imam Petrochemical Complex | 2016 |
208 | HAZOP Study for SIRAF Condensate Refinery | Energy Industries Engineering & Design Com. (EIED) | 2016 |
207 | HAZOP Study for 5MWe Sabalan Geothermal Pilot Power Plant Project | Petro Tech Sun and Nima Consulting Eng. Co. (PTN) | 2016 |
206 | HAZOP Study for Ammonia Unit of Lordegan Urea Fertilizer Company | Lordegan Urea Fertilizer Company | 2016 |
205 | HAZOP Study for Storage Tanks of Esfahan Oil Refinery | Neyr Perse Company | 2016 |
204 | HAZOP and HAZID Studies for Offshore/Onshore Pipelines & SBM of Kish Gas Field Development Project | Omran sahel Company | 2016 |
203 | SIL Study for Platform A20 & A21 of Aboozar Oil Field Project | Jahanpars Engineering and Construction Company | 2016 |
202 | HAZOP, HAZID and SIL Studies for Wellhead Facilities & Flow Lines (North Side) of South Azadegan Project | Oil Design and Construction Company (ODCC) | 2016 |
200 | HAZOP, HAZID, SIL, RAM, QRA and CM Studies of Iran Oman Gas Pipeline Project | Tehran Raymand Consulting Engineers Company | 2015 |
199 | HAZOP and SIL Studies LTE Splitting Unit of Noori Petrochemical Complex | Sazeh Consultants Engineering & Construction | 2015 |
198 | HAZOP Study for First & Second Methanol Production Units of Zagros Petrochemical Complex | Zagros Petrochemical Complex | 2015 |
197 | HAZOP and HAZID Studies for Continuous Bitumen Blowing Plant of Khorramshahr Bitumen Project | RAMPCO Group Engineering, Construction & Maintenance | 2015 |
196 | HAZOP Study for Gasoil Hydrotreating Unit (GHDS) of Tabriz Oil Refinery | Oil Design and Construction Company (ODCC) | 2015 |
195 | HAZOP, HAZID, SIL & QRA Studies for Central Processing Facilities of Azar Oil Field Development | Enerchimi Engineering Company | 2015 |
194 | Development of Training System Based on PSM Approach for BIPC Plant | Bandar Imam Petrochemical Complex (BIPC) | 2015 |
193 | HAZOP and SIL Studies for Ammonia & Urea Units of MIS (Masjed Soleyman Petrochemical Industries Co.) Plant | Petrochemical Industries Design & Engineering Company (PIDEC) | 2015 |
192 | HAZOP Study for Flare Package of Marjan Petrochemical Complex | Kimiagaran Sanat Pars Company | 2015 |
191 | Risk Assessment for Pipelines related to Karun-Ahwaz Corridor for both Existing and Renovation Conditions | Tarhandishan Consulting Engineers Company | 2015 |
190 | HAZOP, HAZID and SIL Studies for Pipelines, Tankage Area and Jetties of Mokran Petrochemical Company | Sazeh Pardazi Iran Consulting Eng. Co | 2015 |
189 | Fireproofing Study for VC، CA and MTBE Unites of Kimia Petrochemical Complex | Kimia Petrochemical Complex-BIPC | 2015 |
188 | Blast Study for VC Unit of Kimia Petrochemical Complex | Kimia Petrochemical Complex-BIPC | 2015 |
187 | HAZOP and SIL Studies for Ammonia Unit and Offsite Facilities of Lavan Petrochemical Complex | Hampa Energy Engineering & Design Company | 2015 |
186 | HAZOP, HAZID and SIL Studies for Wellhead Facilities & Flow lines of Azar Oil Field Development Project | Iran Gas & Water Development Company | 2015 |
185 | HAZOP Study for Wellhead Control Panel (WHCP) of Azar Oil Field Development Project | Kardanan Shargh Company | 2015 |
184 | HAZOP and SIL Studies for Urea Unit and Offsite Facilities of Hormoz Petrochemical Complex Fertilizer Project | Petrochemical Industries Design and Engineering Company (PIDEC) | 2015 |
183 | HAZOP, HAZID and SIL Studies for Oil & Gas Transfer pipelines of North Yaran Oil Field Development | Tehran Jonoob Technical & Construction Company | 2015 |
182 | HAZOP Review for NF3 Plant | Faravaresh Petrochemical Company-BIPC | 2015 |
181 | HAZOP, HAZID and SIL Studies for Cluster Section of North Yaran Oil Field Development Project | Jondishapour Company | 2015 |
180 | HAZOP, HAZID and SIL Studies for Cluster Facilities of Kish Gas Field Development Project | Maroon Karan Company | 2015 |
179 | HAZOP and SIL Studies for Ammonia Unit of Hormoz Petrochemical Complex | Petrochemical Industries Design and Engineering Company (PIDEC) | 2015 |
178 | HAZOP Study for Spent Caustic Pretreatment of Olefin Unit of Bandar Imam Petrochemical Company | Fan Atlas Nopa Company | 2015 |
177 | HAZOP Study for 100 and 300 Units of NGL3200 Project | SADAF Company | 2015 |
176 | Noise Study for Azar Oil Field Development Project | Enerchimi Engineering Company | 2015 |
175 | HAZOP, HAZID and SIL Studies of Dorood D22 Wellhead Platform Project | Saff Rose Mond Engineering & Management Company | 2015 |
174 | Consequence Analysis, QRA, Blast and RAM Studies of North Yaran Oil Field Development Project | Jondishapour Company | 2015 |
173 | HAZOP and HAZID Studies of Polypropylene Truck Unloading Facilities | Pars Geometry Consultant Engineers Company | 2015 |
172 | HAZOP and SIL Studies for C3/C4 Refrigeration, Storage and Ship Loading of Bandar Abbas Persian Gulf Star Gas Condensate Refinery | Shanul Farayand Company | 2015 |
171 | Planning and Establishment of Citizenship HSE Management System and Inspection and monitoring of Performance of Responsible Units in the 22 regions of Tehran Municipality | Tehran Municipality | 2015 |
170 | HAZOP, HAZID, QRA and ERP Studies of Compensate for the Effects of Chamshir Dam Construction Project | Tarhandishan Consulting Engineers Company | 2014 |
169 | Fireproofing Study for Five Units of Basparan Petrochemical Company | Basparan Petrochemical Complex-BIPC | 2014 |
168 | Mercaptans Odor Tolerability Analysis Using Consequence Modeling in Odorant Production Plant | Jahanpars Company | 2014 |
167 | HAZOP and RAM Studies for Gas Sweetening and Sulfur Recovery Units of NGL 3200 Plant | Tehran Raymand Consulting Engineers Company | 2014 |
166 | HAZID Study of NGL 3100 Plant | Energy Industries Engineering & Design (EIED) | 2014 |
165 | Sirri Island Comprehensive Fire Protection and F&G Systems Design | RAMPCO Group Engineering, Construction & Maintenance | 2014 |
164 | Comprehensive Risk Assessment for Wellhead and Gas Gathering Facilities | East Oil & Gas Co (ICOFC) | 2014 |
162 | HAZOP, HAZID, QRA and Firefighting Design for MEK4 Unit of Behran Oil Company | Behran Oil Company | 2014 |
161 | HAZOP Study for Offsite and Utility Facilities of Sahand Khalij-e Fars Bitumen Production Plant | Sahand Khalij-e Fars Company | 2014 |
160 | HAZOP Study on Oxygen Transfer Pipeline between Mobin Petrochemical Complex and Morvarid Petrochemical Complex | Petrochemical Industries Design & Engineers Company (PIDEC) | 2014 |
159 | HAZOP Study for Offsite Facilities of Kermanshah Polymer Company | Kermanshah Polymer Company | 2014 |
158 | HAZOP Study of Four Packages Related to Ammonia and Urea Unit No. III | Pardis Petrochemical Company | 2014 |
156 | HAZOP Study of Phase 12 Interconnecting Pipeline to C2+ Recovery Unit | Nargan Engineers & Constructors Company | 2014 |
155 | HAZOP, HAZID and QRA Studies for NGL-3100 Pipelines | Energy Industries Engineering & Design (EIED) | 2014 |
154 | Risk Assessment and Lifecycle Analysis of Safety Instrumented System (SIS) | Parsian Gas Processing Company | 2014 |
153 | HAZOP, HAZID, SIL, QRA, CM, RAM Studies for North Yaran Field Project | Enerchimi Engineering Company | 2014 |
152 | Job Hazard Analysis (JHA) for Arya Sasol Polymer Company | Arya Sasol Polymer Company | 2014 |
150 | HAZOP Study of South Pars Phase 1 Flare Relocation Project | Oil Design and Construction Company (ODCC) | 2014 |
149 | HAZOP Study for BIPC Petrochemical Complex Basparan HDPE Unit | Bandar Imam Petrochemical Company (BIPC) | 2014 |
148 | HAZOP Study for Kermanshah Polymer Complex Hydrogen Unit | Kermanshah Polymer Company | 2014 |
147 | HAZOP Study for Bandar Abbas Gas Condensate Refinery Power Plant | FARAB Energy & Water Projects | 2014 |
146 | HAZOP Study for Kharg NGL Water Intake | Omran Falat Company | 2014 |
145 | HAZOP Study for South Pars Phases 20&21 | Oil Industries Engineering and Construction (OIEC) | 2013 |
144 | Consequence Modeling in Process Units of Parsian Gas Refining Company | Parsian Gas Refining Company | 2013 |
143 | HAZOP Study of Jurassic Gas Condensate Gathering & Stabilization of Masjed-i-Soleiman | Tarhandishan Consulting Engineers | 2013 |
142 | HAZOP Study for Chlorine Purification Unit of Khuzestan Petrochemical Co. | Khuzestan Petrochemical Company | 2013 |
141 | Vendor Packages HAZOP Studies for South Pars Phases 17&18 | Industrial Projects Management of Iran (IPMI) | 2013 |
140 | HAZOP and SIL Studies for West Ethylene Pipeline Compressor Stations | Oil Turbo Compressor Construction Company (OTCC) | 2013 |
139 | SIL Study for Natural Gas Odorant Production Unit | Jahanpars Engineering and Construction Company | 2013 |
138 | HAZOP Study for Haftkel Production Unit | Oil & Energy Industries Development Company (OEID) | 2013 |
137 | Safety and Security Risk Assessment and Management for Al-Tajiyat and Al-Zawraa Football Stadiums in Baghdad, Iraq | TTBP Consulting Engineers Company | 2013 |
136 | HAZOP Study on Reformer CO2 Recovery Unit of Kermanshah Petrochemical Complex | Shahrekord Carbon Dioxide (SCD) | 2013 |
135 | Health, Safety and Environment (HSE) Hazard Identification for Bu Ali Sina Petrochemical Complex | Bu Ali Sina Petrochemical Company | 2013 |
134 | HAZOP Study of Utility Units of Lordegan Petrochemical Company | Hampa Energy Design & Engineering Company (HEDCO) | 2013 |
133 | HAZOP Study in Gas Injection Compressor Unit of Sarvestan & Saadatabad Production Plant | Oil Design and Construction Company (ODCC) | 2013 |
132 | HAZOP and QRA Study in Conceptual and Basic design of NGL-2400 Plant | Enerchimi Engineering Company | 2013 |
131 | HAZOP, SIL, CM and QRA studies for Farashband Gas Processing Facilities | Enerchimi Engineering Company | 2013 |
130 | HAZOP Study for Damavand Petrochemical Complex Gas Station | Petro Part Company | 2013 |
129 | Buildings Blast and Exposure Risk Assessment of Sirri NGL Plant | NGI and Oil Industries Commissioning& Operation Company (OICO) | 2013 |
128 | Foroozan Field Development New F18 Platform Hazard Identification and SIL Study | Iran International General Contractor (IGC) | 2013 |
127 | Shirkooh (Yazd) Power Plant HAZID Study | FARAB Energy & Water Projects | 2013 |
126 | Concept Risk Assessment and Optimization of Farzad-A Gas Field Development | SLT International | 2013 |
125 | Consequence Modeling of oxygen plants in Mobarakeh Steel, Saba and new development plants | Mobarakeh Steel Company | 2013 |
124 | HAZOP and SIL Studies of Dehdasht Petrochemical Company- Offsite and Utility section | Bamdej Tarh Consulting Engineers | 2013 |
122 | HAZOP Study of Naft-e-Sefid Oil Production Unit | Shanul Farayand Consulting Engineers Company | 2013 |
121 | Yadavaran Oilfield Compressors and API Pumps Packages HAZOP and SIL Studies | SINOPEC Services | 2012 |
120 | HAZOP, HAZID & SIL Studies for Abouzar Offshore Oilfield Expansion | Consortium of Jahanpars & DRGOIL | 2012 |
119 | Genaveh 10mBBL Storage Tanks HAZOP, HAZID and SIL Studies | Tehran Jonoob Technical and Construction Company | 2012 |
118 | HAZOP, HAZID, SIL and QRA Studies for Yadavaran Oilfield Development Export Pipelines | Jahanpars Engineering and Construction Company | 2012 |
117 | Risk Assessment and Integrity Management of NISOC Oil, Gas and NGL Pipeline Crossings | Tarhandishan Consulting Engineers Company | 2012 |
116 | Azar Oilfield Development Hazard Identification (HAZOP/HAZID), Risk Assessment and Reliability Analysis | Tehran Raymand Consulting Engineers Company | 2012 |
115 | HAZOP Study of 32" Gas Transfer Pipeline between Phase 6, 7&8 and Phase 17&18 | Industrial Projects Management of Iran (IPMI) | 2012 |
114 | Bahregan Field Crude Oil Storage Capacity Expansion Project HAZOP and HAZID | Tehran Berkeley Consulting Engineers Company | 2012 |
113 | Setareh Qeshm Bunkering and Shipping Services Project HAZOP and Risk Assessment | Qeshm Star Bunkering and Shipping Services Company | 2012 |
112 | Hazard Identification, QRA and Buildings Risk Assessment for West Karoun Fields Revamping Project |
Energy Industries Engineering & Design (EIED) | 2012 |
111 | Hazard Identification and Quantitative Risk Assessment of Abadan-Rey Pipeline Pump Stations | Bina Consulting Engineers Company | 2012 |
110 | HAZOP Study on Arak Petrochemical Company Storage Tanks and Export Facilities at Mahshahr | Iran Itok Company | 2012 |
109 | Integrated HAZOP, SIL Study for Yadavaran Oilfield Development Project LLI Packages and EPCC Packages Interfaces | SINOPEC Services | 2012 |
108 | Fault Tree Analysis for Hazard Identification and Risk Assessment of Mobarakeh Steel Complex Cranes Operations | Esfahan Mobarakeh Steel Company | 2012 |
107 | HAZOP Study of Firuzabad Olefin Complex | Nargan Engineering Company (NEC) | 2012 |
106 | HAZOP Study on Fractionation Section of Parsian C2+ Recovery Project | Hampa Energy Engineering and Design Company (HEDCO) | 2012 |
105 | HAZOP Study on Utility Units of Zanjan Petrochemical Plant | Hampa Energy Engineering and Design Company (HEDCO) | 2012 |
104 | Shurijeh Gas Treatment, Injection and Storage Facilities – Safety Analysis | Jondi Shapour Company | 2012 |
103 | HAZOP and SIL Studies on Jetty and Loading Facilities of Kharg NGL Recovery Plant | Rahbord Energy Design & Development Engineering Company | 2012 |
102 | HAZOP, SIL and QRA Studies of Yadavaran EPS Facilities | Jahanpars Engineering and Construction Company | 2012 |
101 | HAZOP Study of Utility Facilities | Kermanshah petrochemical complex | 2012 |
100 | HAZOP and HAZID Study of Iran Qeshm Oil Production Unit |Extension | Saied Sanat Maron Company | 2012 |
99 | Fire Risk Identification and Assessment for Plastic Films Production Plant | Bayazian Industrial Group | 2012 |
98 | HAZOP & SIL Study on Boroujen Petrochemical Company Utility and Off-Site plant | Bamdej Tarh Consulting Engineers | 2012 |
97 | HAZOP Study on Damavand Power & Steam Generation Plant | Mapna Special Projects Construction & Development Company (MD-3) | 2012 |
96 | Smoke Extract and Ventilation Management | ATEC Consultants | 2012 |
95 | HAZOP Study of Mehr Petrochemical Company-Offsite and Utility section | Petro-Sazeh Iranian Company | 2012 |
94 | HAZOP Study of Iran LNG Water Package | Kherad Industry Technical & Engineering Company | 2012 |
93 | HAZOP Study on South Pars Gas Field Development – Phase 20 & 21 | Oil Turbo Compressor Company (OTCC) | 2012 |
92 | HAZOP and SIL Studies of Gas Treating Units – Iran LNG Complex | Sazeh Consultants | 2012 |
91 | HAZOP & SIL Study on 4th Pataveh Gas Compressor Station | Design & Inspection Company | 2011 |
90 | HAZOP Study on Pardis 3rd Ammonia Project | Pardis Petrochemical Company | 2011 |
89 | HAZOP, HAZID and SIL Studies for Latif Flow line & Reception Facility at SawanCentral Processing Plant Project | Combined Engineering & Integrated Solutions (CEIS) | 2011 |
88 | HAZOP Study on DRA Production Plant | Aras Sepehr Afza Company | 2011 |
86 | HAZOP and SIL Study on Yadavaran Oil Field Development - Flow and Infield Lines and Manifolds System and wellhead area | Khalkhal Dasht International | 2011 |
85 | HAZOP and SIL Study on Yadavaran Oil Field Development - Gas/Oil Separation Unit (GOSU) and Central Treatment Export Plant (CTEP) | Jahan Pars E&C Company | 2011 |
84 | HAZOP Study on HPU & WHCP & OWS Packages of South Pars Phases 15/16 | Iran Shipbuilding & Offshore Industries Complex (ISOICO) | 2011 |
83 | HAZOP Study on Kharg Island Gas Gathering & NGL Recovery Project-Dorood I & II | BIDEC Company | 2011 |
82 | HAZOP, HAZID and Consequence Modeling on Tange-e-Bijar & Kamankuh Gas Field | Tehran Raymand Consulting Engineers | 2011 |
81 | HAZOP and SIL Studies – Yadavaran Field Development Early Production System | Jahan Pars E&C Company | 2011 |
80 | HAZOP, HAZID and SIL Studies – IGAT VI Khoormouj and Deylam Compressor Stations | Pars Engineering Company | 2011 |
79 | HAZOP and SIL Studies – Mamassani Petrochemical Company Utility and Off-Sites | Bamdej Tarh Engineering & Management | 2011 |
78 | HAZOP Study – RIPI Gas Distribution Network | Maad Kimia Farayand Consulting Engineers Company | 2011 |
77 | HAZOP Study – Kermanshah Petrochemical Company | Kermanshah Petrochemical Company | 2011 |
76 | Model Safety Integrity Levels (SIL) Analysis – Sirri NGL Project | Iranian Offshore Oil Company (IOOC) | 2011 |
75 | Environmental Impact Assessment – Varavi Development Project | Farab-Nardis Consortium | 2011 |
74 | Quantitative Risk Assessment and Reliability Analysis – Kharg NGL Project Utility Area | Farab-Nardis Consortium | 2011 |
73 | HAZID Study – Kharg NGL Project | Iran International Engineering Company (IRITEC) | 2010 |
72 | Quantitative Risk Assessment and Management– Kharg NGL Project Storage Area | Design and Construction Management Company (DCMC) | 2010 |
71 | HAZOP and SIL Studies of Qeshm Topping Plant | Nik Sanaat Parsian Investment Company | 2010 |
70 | Masjid-i-Suleyman Field Development Project Hazard Identification Studies | China National Petroleum Corporation (CNPC) | 2010 |
69 | HAZOP Study on Flare Relocation Project for South Pars Phase 1 | Petro Part Company | 2010 |
68 | Consequence Modeling and Risk Assessment – Kharg NGL Project | Iran International Engineering Company (IRITEC) | 2010 |
67 | HAZOP Study in Arak, Shiraz and Tabriz Bitumen Plants | Pasargad Oil Company (POC) | 2010 |
66 | HAZID Study in Bandar Imam Bitumen Export/Import Terminal | Pasargad Oil Company (POC) | 2010 |
65 | HAZOP Study of Tehran Refinery Sweetening Plant | Tanootas Taban Engineering and Construction Company | 2010 |
64 | HAZOP Study of Bandar Abbas Refinery Gasoline Production Increase Project | Petrochemical Industries Design & Engineering Co. (PIDEC) | 2010 |
63 | Shurijeh Gas Storage Project - Risk Management Decision Support Studies | Jondi Shapour Company | 2010 |
62 | Dorood III Compressor Station – Risk Assessment & Management Services | Alborz Masir Company | 2010 |
61 | MC Services (HSE) – Abadan Bitumen Production Plant | Pasargad Oil Company (POC) | 2010 |
60 | MC Services (HSE) – Mahshahr Bitumen Export Terminal | Pasargad Oil Company (POC) | 2010 |
59 | HAZOP Study of Hengam Field Early Production Project | Iran Offshore Oil Company (IOOC) | 2010 |
58 | HAZID Study of Hengam Field Early Production Project | Iran Offshore Oil Company (IOOC) | 2010 |
57 | Karun-Ahwaz Pipeline Corridor Risk Assessment and Management | Tarhandishan Consulting Engineers Company | 2009 |
56 | HAZOP Study of Sulphur Granulation Plant | Ehsan Joint Venture | 2009 |
55 | HAZOP Study of Sirri-Assaluyeh Pipeline | Iran International General Contractor (IGC) | 2009 |
54 | Environmental Impact Assessment – Dehloran Development Project | Iran Central Oil Fields Company (ICOFC) | 2009 |
53 | HAZOP Study of Fajr-2 Co-generation Plant | Mapna Special Projects Construction & Development Company (MD-3) | 2009 |
52 | HAZOP Study of Persian Gulf Star Refinery Water Intake | SADRA Iran Marine Industrial Company | 2009 |
51 | HAZOP Study of Rangin Caman Project (Site F) | Paydar Energy Persia Consulting Engineers | 2009 |
50 | HAZOP Study of Serajeh Gas Field Early Production Surface Facilities Phase "1"-Part"2" | Iran Itok Company | 2009 |
49 | HAZOP Study of NGL-1000 Gas Pre-compression Unit | Kherad Industry Technical & Engineering Co | 2009 |
48 | Hazard Identification and Risk Evaluation at Bandar Abbas Oil Refinery - Section A | Bandar Abbas Oil Refinery | 2009 |
47 | HAZOP, HAZID and SIL Studies for Lavan Island Power Plants Fuel Supply Project | Payandan Company | 2009 |
46 | Risk Management and Contractors' HSE Management System Development | Pasargad Oil Company (POC) | 2009 |
45 | Power Generation Plant - South Pars Gas Field Development Phase 6, 7, 8 | Hirbodan Engineering Company | 2009 |
44 | Consequence Modeling of Major Process Accidents in Esfahan Oil Refinery | National Iranian Oil Refining and Distribution Company | 2008 |
43 | Consequence Modeling of Major Process Accidents in Arak Oil Refinery | Arak Oil Refinery | 2008 |
42 | HAZOP and HAZID Studies of Sirri Platforms Renovation Project | Darya Sahel Company | 2008 |
41 | South Gashu Gas Field Development Project – Consequence Analysis | Tehran Raymand Consultants | 2008 |
40 | Rangin Caman (Chemicals Manufacturing) – Safety Detailed Engineering | Aria Pishro Gharn and Rangin Caman Engineering Office | 2008 |
39 | Consequence Modeling of Probable Process Accidents in Bidboland Gas Refinery | Bidboland Gas Refinery | 2008 |
38 | NGL-3100 (Cheshme Khosh) – Risk Assessment | Sazeh Consultants | 2008 |
37 | Consequence Modeling of Probable Process Accidents in Tondguyan Petrochem Complex | Tondguyan Petrochemical Complex | 2008 |
36 | Khesht Oilfield Development Detail Engineering – Safety Engineering Services | SADRA Iran Marine Industrial Company | 2008 |
35 | Bandar Abbas Refinery Feed Supply Pipeline and Single Point Mooring (SPM) Project | Qeshm Island Oil and Gas Investment Company | 2008 |
34 | Bandar Abbas Bitumen & Heavy Petroleum Products Export Terminal | Pasargad Oil Company (POC) | 2008 |
33 | Ammonia and Chlorine Storages Consequence Modeling in Shiraz Petrochem Complex | Shiraz Petrochemical Complex | 2008 |
32 | sLavan Refinery Upgrading & Revamping Project Offsite Utility & Storage Tanks Project (EPC)-Part 2 | Iran International General Contractor (IGC) | 2008 |
31 | HAZOP Study of Lavan Oil Refinery - Existing Heavy Naphtha Hydrotreating Unit | Iran International General Contractor (IGC) | 2008 |
30 | HAZOP Study of South Pars Oil Layer (SPOL) | Amid Engineering & Development Company | 2008 |
29 | HAZOP Study of New Tail Gas Treatment Unit - Tehran Oil Refinery | EHSAN Joint Venture | 2008 |
28 | HAZOP Study of Sulphur Recovery Plant - Tehran Oil Refinery | Nargan Engineers and Constructors | 2008 |
27 | HAZOP Study of Hydrogen Production Unit - Tehran Oil Refinery | Nargan Engineers and Constructors | 2008 |
26 | Tehran Oil Refinery Products Upgrading (Clean Fuels) Project – HAZOP | Oil Design and Engineering Company (ODCC) | 2008 |
25 | HAZOP Study of Mahshahr Oil Terminal Jetties Facilities | Machine Sazi Arak | 2008 |
24 | South Pars Phases 15 & 16 – Detail Engineering – Offshore Platforms | SLT Engineering (SLTE) International | 2007 |
23 | Hazard Identification and Evaluation at Tabriz Oil Refinery | Tabriz Oil Refinery | 2007 |
22 | Lavan Refinery Upgrading & Revamping Project Offsite Utility & Storage Tanks Project (EPC)-Part 1 | Iran International General Contractor (IGC) | 2007 |
21 | Reshadat Offshore Oilfield Renovation & Development Detailed Engineering | Pazhouhesh Sanat Naft Company (affiliated to SADRA) | 2007 |
20 | Basic Design and Preparation of EPC Tender Documents for Lavan Refinery Revamping and Upgrading | Namvaran Engineering Company (NCE) | 2007 |
19 | Mobin Petrochemical Complex – Pars Petrochemical Port-As-Built | Payandan-Tarh Andishan consortium | 2007 |
18 | Mobin Petrochemical Complex – Pars Petrochemical Port – HAZOP | Payandan-Tarh Andishan consortium | 2007 |
17 | Khesht Oilfield Development Detailed Engineering | Pazhouhesh Sanat Naft Co. (affiliated to SADRA) | 2007 |
16 | Mobin Petrochemical Complex – Interconnecting Lines and Offsite Facilities | NPC - AZAAN Consortium | 2007 |
15 | Mobin Petrochemical Complex - Sea Water Intake and Cooling Water | SADRA Iran Marine Industrial Company | 2007 |
14 | Hazard Identification and Evaluation at Bandar Abbas Oil Refinery | Bandar Abbas Oil Refinery | 2007 |
13 | Gotvand Oil and Gas Pipeline Risk Assessment and Integrity Management | Tarh Andishan Consulting Engineers (Tehran) | 2006 |
12 | Emergency Planning for CNG Stations | Greater Tehran Gas Company (Tehran) | 2006 |
11 | Tabriz Petrochemical Plant – HIPS II Unit Detailed Engineering | Pazhouhesh Sanat Naft (on behalf of Tabriz Petrochemical Co., Tabriz) | 2006 |
10 | Fajr Jam Gas Treatment Plant – LPG Recovery Unit Detailed Engineering | Petro Sanat Maad (on behalf of Fajr Jam Gas Treatment Co., Assaluyeh) | 2005 |
9 | South Pars Development Project Phases 6,7,8 – Blast Analysis of GTG Control Building | Hirbodan Engineering Company | 2005 |
7 | Hazard Identification and Evaluation at Shiraz Petrochemical Complex | Shiraz Petrochemical Company | 2005 |
6 | Mansuri Oilfield Development Studies-Phase 1 - Temporary Facilities | Parsikan Iran Consulting Eng. (on behalf of PEDEC) | 2004 |
5 | Mansuri Oilfield Development Studies-Phase 2 - New Facilities | Namvaran Consultants (on behalf of PEDEC) | 2004 |
4 | Hazard Identification and Evaluation at Razi Petrochemical Complex | Razi Petrochemical Company | 2004 |
3 | Hazard Identification and Evaluation at Arak Petrochemical Complex | Arak Petrochemical Company | 2004 |
2 | Hazard Identification and Evaluation at Khorasan Petrochemical Complex | Khorasan Petrochemical Company | 2000 |
1 | Various Safety Engineering Services | Various; including NIOC, NIGC, and NPC | 2000 |